Use following Facility Type and I.D. designators if applicable.
For Utility projects the Facility
Facility Type
I.D. Designator shall be as follows:
AFLD
=
AIRFIELD
BLDG *
=
BUILDING
SWTR
=
SALT WATER
DRDG
=
DREDGE
FWTR
=
FRESH WATER
DRYD
=
DRYDOCK
PWTR
=
POTABLE WATER
BRTH
=
BERTH
NGAS
=
NATURAL GAS
PIER
=
PIER
STEM
=
STEAM
SLIP
=
WET SLIP
SSWR
=
SANITARY SEWER
PRKG
=
PARKING LOT
STRM
=
STORM DRAIN
ROAD
=
ROAD
CAIR
=
COMPRESSED AIR
RAIL
=
RAIL
POWR
=
POWER
FENC
=
FENCE
COMM
=
GATE
=
GATE
CATV
=
CABLE TV
UTIL
=
UTILITY
CRAN
=
CRANE
For Rail projects the Facility
I.D. Designator shall be as follows:
CRAN
=
CRANE RAIL TRACK
TRAK
=
RAIL ROAD TRACK
7-3.2.4
Drawing Support Files.
Support files necessary for initializing, editing and plotting drawing files shall be a
standard component of Autodesk or Microsoft Windows (see NAVFAC version
compatibility information on WBDG at
http://www.wbdg.org/references/pa_dod_ntools.php) ; or they shall be an integral and
standard component within the drawing file that require no third party custom utility or
program to utilize. Support files include, but are not limited to, line types, hatch
patterns, font styles, layer filters, display configurations and object styles. Drawing files
containing objects, styles, or definitions that require any external files (e.g. SHX, LIN or
LAY) to initialize, operate and display properly will be rejected.
7-3.3
Cost Estimates.
Submit the contract cost estimate electronically with each submittal. Do not submit the
cost estimate on the project CD when provided. Make all cost estimating submissions
in accordance with the NAVFAC Cost Engineering Policy and Procedures
(http://www.uscost.net/costengineering) manual.
7-3.4
Intermediate Design or RFP Submittals.
29