6-3.1
Every block is filled out, checked, or N/A. The only blanks allowed are in Item
Remarks (column 23).
6-3.2
Blocks 1 and 5 (FROM and TO) contain the appropriate installations or
organizations and zip codes for the transferring and accepting RPAOs.
6-3.3
Block 6 contains the Installation Number and Site Name of the actual facility
location.
6-3.4
Block 9, Transaction Details, exactly one checkbox is checked for subparts 9A,
9B, and 9C. There can be no multiple checkboxes.
6-3.5
If "Other" is checked in either 9A or 9B, there is an explanation in Project
Remarks (block 28).
6-3.6
Effective Date must be shown in subpart 9D.
6-3.7
All facilities included in this project and the different category codes within each
facility (over 1,000 GSF) are separately identified with one Item Number per facility in
column 10.
6-3.8
No quantities of a single category code physically located in different buildings
are combined into a single Item Number in column 10.
6-3.9
Each column 10 Item Number has an appropriate entry in columns 11 through
22. N/A is acceptable for either area or other measurement when both are not prescribed
and for cost and fund source of multipurpose buildings if they are already listed for that
facility.
6-3.10
Columns 16 and 18 have quantities for both area and capacity/other
measurements for categories when both units of measure are prescribed (e.g., in DA PAM
415-28).
6-3.11
Column 19 has costs assigned to each facility Item Number.
6-3.12
Column 20 has an appropriate Fund Source that is listed in the Appendix E
corresponding to every cost in column 19.
6-3.13
Column 21 has a Funding Organization that is listed in the Appendix F for every
cost in column 19.
6-3.14
Column 22 has an Interest Code that is listed in the Appendix G for every cost in
column 19.
6-3.15
Column 23, Item Remarks, pertain specifically to the Item Number. Project
6-3