UFC 1-300-09N
25 May 2005
Change 1, 22 February 2006
Change 2, 4 December 2006
10-2.2.3
Electrical:
Need not provide extensive details but must be complete enough to thoroughly
express the Designer's intentions and include the following:
Existing Site and Demolition Plan.
Site Plan.
Single Line Diagram.
Preliminary floor plans with dedicated space clearly identified for electrical
and telecommunications rooms.
10-2.2.4
Fire Protection:
Code Compliance Summary Sheets.
Life Safety Floor Plan.
10-2.2.5
Geotechnical:
Boring log drawings are encouraged, not required.
10-2.3
Calculations:
Calculations must be complete and in sufficient detail to support the items outlined in
the Basis of Design and indicated on the drawings. Provide calculations required by the
Discipline-Specific UFCs and as follows.
10-2.3.1
Electrical:
Preliminary Design Analysis including Preliminary load calculations for utility
connections.
10-2.4
Charettes and Functional Analysis Concept Development (FACD)
Studies.
Charettes and FACDs may be used in DB to develop the Project Program in the RFP,
or in DBB to develop the design of the project. Both use value-engineering techniques
to develop concept designs. Provide charette or FACD when required by the contract.
10-2.4.1
Description.
55