GENERAL REQUIREMENTS.
The contract identifies which submittal stages, from Concept to Final, are required and
any additional stages. Designs may be incremented in stages, i.e. DOR or Contractor
may only be authorized to proceed to one stage at a time due to funding limitations.
The information presented below defines the minimum level of information required at
each submittal stage.
10-1.1
Discipline-Specific Guidance.
Additional and more detailed guidance for each discipline is found in other Unified
Facilities Criteria. Unless specified otherwise in the contract, follow these criteria for
each stage of design. The list of these discipline specific UFCs, when referenced in
whole herein, are referred to as Discipline-Specific UFCs. This list of Discipline-Specific
UFCs, in whole, follows:
UFC 1-200-01, General Building Requirements
UFC 3-100-10N, Architecture
UFC 3-120-10, Interior Design
UFC 3-200-10N, Civil Engineering
UFC 3-201-02, Landscape
UFC 3-220-01N, Geotechnical Engineering Procedures for Foundation
Design of Buildings and Structures
UFC 3-300-10N, Structural Engineering
UFC 3-400-10N, Mechanical Engineering
UFC 3-500-10N, Electrical Engineering
UFC 3-600-01, Fire Protection Engineering
UFC 3-600-10N, Fire Protection
UFC 3-800-10N, Environmental Engineering for Facility Construction
10-1.2
Number of Copies.
Provide number of electronic and hard copies required for each submittal, and comply
with any additional requirements specified in the contract.
10-1.3
Responding to Review Comments.
The DOR or Contractor is responsible for the resolution and incorporation of
government comments into the project design. At each submittal, return and address
previous review comments. If the comment was incorporated into the design, a
response shall so indicate. If the comment was not incorporated, an explanation shall
50