UFC 1-300-09N
25 May 2005
Change 1, 22 February 2006
Change 2, 4 December 2006
Fire Suppression plans.
Fire Alarm and Mass Notification System Plans.
Detail Sheets.
10-3.2.8
Geotechnical.
Results of subsurface investigation boring logs, test pit logs, etc.
10-3.3
Outline Specifications.
Provide outline specifications, in the form of a list of specification sections the DOR
intends to use in the job.
For Design-Bid-Build, and when required by the RFP, use Unified Facilities Guide
Specifications, as described in Chapter 5. Provide a listing of the UFGS used in the job
by Section Number, Title, and Section Date. Precedence for choosing UFGS master
guide specifications sections for use in a project is described in paragraph 5-2.5, unless
required otherwise by the contract.
10-3.4
Color Boards.
Provide separate interior and exterior color boards indicating all proposed material and
color selections.
10-3.5
Calculations.
Provide the following calculations, as a minimum, and as defined in detail by the
Discipline-Specific UFCs.
10-3.5.1
Structural and Geotechnical.
Provide Structural and Geotechnical calculations in sufficient detail to support the items
outlined in the Basis of Design and indicated on the drawings.
10-3.5.2
Pavements.
Provide Pavements calculations in sufficient detail to support the items outlined in the
Basis of Design and indicated on the drawings.
10-3.5.3
Sustainable Design and Mechanical.
10-3.5.3.1
Energy Analysis.
59