UFC 3-260-11FA
25 May 2005
The Contractor-developed drawings shall show all aspects of the
construction phasing on the sheets PHASING PLANS AND DETAILS,
which shall be included with the first design submittal.
1.4.4
Phasing Plan
The Contractor shall prepare a construction phasing plan meeting
all the RFP requirements and additional requirements of Section
A15.3 of Attachment 15 in UFC 3-260-01. The Contractor Phasing
Plan shall be included in the first design submittal.
The construction schedule developed by the Contractor shall
include a minimum of 48 hours between phases to allow the Air
Base to adjust traffic operations.
1.5
NOTICE OF CONSTRUCTION
FAA Form 7460-1, NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION
least 30 days prior to the start of construction. Form 7460-1 will be
submitted by the Air Base Manager, but the Contractor must provide all
information and prepare the form for submission.
1.6
NOTICE TO AIRMEN (NOTAM)
1.6.1
References
Air Force Joint Manual 11-208, Army Regulation 95-10, OPNAVINST
3721.20b Department of Defense Notice to Airmen (NOTAM) System.
FAA ADVISORY CIRCULAR 150/5200-28, Notices To Airmen (NOTAMS) For
Airport Operators.
1.6.2
Issuance of NOTAMS
Only Air Base Management can close, open, or restrict the use of
any part of an airfield facility. Any conditions that would
prevent, restrict, or present a hazard to arriving or departing
aircraft requires public notification. Public notification is
accomplished by the Notice to Airmen (NOTAM) system. NOTAMS are
submitted to the FAA by the Air Base Management. It is the
responsibility
of
the
Contractor
to
coordinate
with
the
Contracting
Officer
for
the
issuance
of
NOTAMS
during
construction.
The
Contractor
shall
provide
the
necessary
information at least 72 hours before occurrence of the event that
requires the NOTAM.
1.7
SECURITY AND OPERATIONAL SAFETY
1.7.1
General
01016 - 2