UFC 3-260-11FA
25 May 2005
1.7.3.4
Operational Safety Plan
5
1.8
EXISTING SITE CONDITIONS
5
1.8.1 Site Inspection
5
1.8.2 Surveys
5
1.8.3 Existing As-Built Drawings and Specifications
6
1.9
UTILITIES
6
1.9.1 Utility Capacity
6
1.9.2 Location of Utilities
7
1.9.3 Airfield Electrical System
7
1.9.4 Protection of Utilities
7
1.9.5 Interruption of Utilities
7
1.9.6 Use of Utilities
7
1.10
DEMOLITION
7
1.10.1 General
7
1.10.2 Removal of Bituminous Pavement
8
1.10.3 Removal of Concrete Pavement
8
1.10.4 Disposal of Demolition Debris
8
1.11
EARTHWORK AND GRADING
8
1.11.1 General
8
1.11.2 Work in Critical Areas
8
1.11.3 Disposal of Excess Excavation
9
1.12
CONTRACTOR HAUL ROUTES
9
1.12.1 Air Operations Area (AOA) Pavements
9
1.12.2 Closed Airfield Pavements (Existing or New)
9
1.12.3 Haul Roads
9
1.12.4 Unsatisfactory Cleaning
9
1.13
RECYCLING
10
1.13.1 General
10
01016TOC - 2