UFC 3-260-11FA
25 May 2005
Contractors shall verify that adequate capacities for water and
power are available outside the project site to support the
proposed improvements during the proposal phase. If adequate
utilities are not available, the Contractor shall furnish all
utilities required for the proposed improvements.
1.9.2
Location of Utilities
The Government will furnish all available information pertaining
to all utility lines known to exist at and in the immediate
vicinity of the site. The Contractor shall verify by field
1.9.3
Airfield Electrical System
The Government will furnish all available information regarding
the underground wiring, conduits and appurtenances of the
airfield lighting system as well as visual and electronic
navigation aids within the project site. Prior to beginning work
on any construction phase, the Contractor shall field locate and
mark all subsurface electrical systems within the construction
area.
1.9.4
Protection of Utilities
Prior
to
construction,
the
Contractor
shall
notify
the
Contracting Officer of the Contractor's plans for utility
protection. In the event of an unexpected utility interference
during construction, the Contractor shall immediately notify the
Contracting Officer.
1.9.5
Interruption of Utilities
The Contractor shall notify the Contracting Office and the
appropriate Air Base personnel immediately upon the disturbance
of any existing utility during construction. Any utility
disturbed by the Contractor's operations shall be restored
immediately at no cost to the Government. Any interruption of a
utility service, including airfield electrical systems, that is
necessary for construction must be coordinated and receive prior
approval in accordance with Section 00800.
1.9.6
Use of Utilities
See Section 00800-1.12 and Section 1500-1.2 regarding Use
of Utilities.
01016 - 6