1.4 SUBMITTALS
Limit Submittals to those necessary for adequate quality control. Submittal
requirements are organized using the following eleven classifications:
SD-01 Preconstruction Submittals
SD-02 Shop Drawings
SD-03 Product Data
SD-04 Samples
SD-05 Design Data
SD-06 Test Reports
SD-07 Certificates
SD-08 Manufacturer's Instructions
SD-09 Manufacturer's Field Reports
SD-10 Operation and Maintenance Data
SD-11 Closeout Submittals
1.5 QUALITY ASSURANCE
1.5 Qualifications
This paragraph includes statements of qualifications for contractor designers,
manufacturers, fabricators, welders, installers, and applicators of products and
completed work.
1.5.2 Regulatory Requirements
This paragraph includes obligations for compliance with specific code requirements for
contractor-designed items such as wood trusses, labeling such as Underwriters
Laboratory, Inc., and requirements of public authorities such as state highway
departments.
1.5.5 Pre-Installation Conference
This paragraph can be used to specify conferences to coordinate the work or to
sequence related work for sensitive and complex items.