UFC 1-300-02
September 2004
Change 4 December 2006
3.4 INSTALLATION
This paragraph may be used when more appropriate than paragraph ERECTION.
3.5 APPLICATION
This paragraph may be used when more appropriate than paragraph ERECTION.
3.5.1 Special Techniques
This paragraph describes special procedures for incorporating products. These
procedures may include spacings, patterns, or unique treatments. The wording of the
paragraph title should reflect the subject matter.
3.5.2 Interface with Other Products
This paragraph provides descriptions specific to compatibility and transition to other
materials. This may include incorporating accessories, anchorage, and any special
3.5.3 Tolerances
This paragraph covers allowable variations in application thickness or from indicated
locations.
3.6 FIELD QUALITY CONTROL
3.6.1 Tests
This paragraph defines the tests required for installed or completed work. These tests
are different and separate from those required for materials and products prior to
installation or application.
3.6.2 Inspection
This paragraph defines the inspections required for installed or completed work. These
inspections are different and separate from those required for materials and products
prior to installation or application.
3.6.3 Manufacturer Field Service
This paragraph covers specific requirements when manufacturers are to provide field
quality control with onsite personnel for instruction or supervision of the installation or
application of their products, or for startup or demonstration.
3.7 ADJUSTING AND CLEANING
This paragraph provides final actions to prepare installed equipment or other completed
work to properly function or perform.
15