UFC 3-410-04N
25 October 2004
spray area or paint overspray and vapors from escaping and migrating into adjacent
work areas. See paragraph 2-4.5 for detailed design criteria.
NOTE U. S. Army and U.S. Air Force: Design the replacement air
system at Army facilities to maintain a slightly negative air pressure inside the hangar.
10-5.1
Heating and Air Conditioning.
See paragraph 2-4.5.
10-6
SYSTEMS CONTROLS. Design system controls in accordance with
paragraph 2-5.
10-7
RESPIRATORY PROTECTION. See paragraph 2-7.3.
10-4