Home
Download PDF
Order CD-ROM
Order in Print
Home
>
United Facilities Criteria CD 1
>
> Industrial Ventilation - index
Industrial Ventilation - index
Chapter 1: Introduction - ufc_3_410_04n0010
Chapter 2: General Requirements
Design Criteria - ufc_3_410_04n0012
Fans
Exhaust Stack
Replacement Air
Figure 2-2. Decision tree for replacement air design.
Plenum Design
Perforated Duct Design
Annunciator Panel.
Operatioinal Considerations
Safety and Health Considerations - ufc_3_410_04n0021
Emergency Showers and Eyewash Stations
Chapter 3. Asbestos Delagging Facilities
Figure 3-1 Delagging facility floor Plan.
Typical Hood Design for Low Profile Work pieces
Weather Stack Design and Location. - ufc_3_410_04n0026
Industrial Vacuum System
Table 3-1. Minimum Volumes and Vacuum Hose Size for Asbestos Operations
Replacement Air. - ufc_3_410_04n0029
Safety And Health Considerations. - ufc_3_410_04n0030
Chapter 4: Otto Fuel II Facilities
Figure 4-1. Layout for the MK-46 fuel/defuel and afterbody breakdown room.
MK-46 Workbench Hood.
Figure 4-4. MK-46 workbench hood.
Exhaust Air for MK-48 Ventilated Spaces.
MK-48 Afterbody Teardown Hood.
Figure 4-7. MK-48 afterbody teardown hood.
Figure 4-8. MK-48 workbench hood.
MK-48 Refueling Hood
Weather Stack Design and Location. - ufc_3_410_04n0040
Figure 4-12. Vertical distribution method.
Safety and Health Considerations - ufc_3_410_04n0042
Chapter 5: Fiberglass Reinforced Plastic Fabrication And Repair Facilities
Design Criteria - ufc_3_410_04n0044
Table 5-1. Recommended Hood, Capture Velocity, and Air Pollution Device
Figure 5-2. Workbench Hood.
Figure 5-4. Spray up Booth.
Ventilated Workbench and Sink.
Figure 5-6. Exhaust system schematic.
Replacement Air. - ufc_3_410_04n0050
Safety And Health Considerations - ufc_3_410_04n0051
Chapter 6: Abrasive Blasting Facilities
Figure 6-1. Downdraft Blast Enclosure.
Access Doors and Observation Windows.
Air Cleaning Devices.
Safety And Health Considerations. - ufc_3_410_04n0056
Hygiene Facilities
Chapter 7: Wood Shop Facilities
Figure 7-1. Floor Sweep
Safety and Health Considerations - ufc_3_410_04n0060
Chapter 8: Battery Maintenance Facilities
Figure 8-1. Ventilation system for battery maintenance facilities.
Minimum Flow Rate Calculation.
Safety and Health Considerations - ufc_3_410_04n0064
Safety and Health Considerations - Continued
Chapter 9: Paint Spray Booths.
Exhaust Configurations.
Figure 9-1. Walk-in downdraft paint booth.
Figure 9.2. Drive- Through Cross Draft Paint Booth With Mechanical Replacement Air.
Paint Spray Booth Exhaust Filtration System
Figure 9-4. Paint Mixing Hood And Work Bench
System Controls.
Chapter 10: Aircraft Corrosion Control Hangars
Figure 10-1. Crossdraft corrosion control hangar.
Figure 10-2. Hangar Door And Exhaust Plenum Details.
Heating and Air Conditioning
Glossary - ufc_3_410_04n0077
Glossary -Continued - ufc_3_410_04n0078
Glossary -Continued - ufc_3_410_04n0079
Abbreviations And Acronyms
Abbreviations And Acronyms - Continued - ufc_3_410_04n0081
Abbreviations And Acronyms - Continued - ufc_3_410_04n0082
Figure B-1. NFESC's Letter to OSHA
Figure B-2.OSHA's Interpretation.
Appendix C. Letters Related To Airflow Requirements For Corrosion Control Hangars
Figure C-1. NFESC Memorandum to OSHA
Figure C-1. NFESC Memorandum to OSHA cont.
Figure C-2. OSHA Interpretation.