CEMP-E
TI 811-12
18 August 1998
gg. Compressed Air Systems.
(1)
Status.
(2)
Pressure.
(3)
(4)
hh. Sewage Treatment Plans.
(1)
Status.
(2)
Operating hours of equipment.
(3)
Metering of treated sewage in CFM.
(4)
Measuring of chlorine and pH/values.
ii.
Water Distribution.
(1)
Metering of consumption.
(2)
Leak detection.
9-6