CEMP-E
TI 811-12
18 August 1998
(1)
Unit status.
(2)
Scheduled exercising.
(3)
Fuel storage tank levels.
(4)
(5)
Run-time monitoring.
c.
Power Plants.
(1)
Status.
(2)
Efficiency.
(3)
Fuel storage.
(4)
Tank level.
(5)
Run-time monitoring.
d. Uninterruptible Power Supplies.
(1)
Status.
(2)
Battery voltage and charging current.
(3)
UPS output voltage and load.
e. Exterior Lighting.
(1)
Time scheduled control.
(2)
Intensity reduction after " eak"hours.
p
f.
Interior Lighting.
(1)
Time scheduled control.
(1)
Status.
(2)
Voltage and load.
(3)
h. Switching Stations.
(1)
Status.
(2)
Breaker control.
i.
9-2