CEMP-E
TI 811-12
18 August 1998
(1)
Status.
(2)
(3)
Run-time monitoring.
j.
(1)
Machine room temperature alarm.
(2)
Common alarm from control pane.
k.
Water Treatment Systems.
(1)
Status.
(2)
(3)
Consumption.
l.
Sewer System.
(1)
Flow/level in manholes and retention basins.
(2)
Status and run-time of sewage lift pumps.
m. Chlorination (Including Electrolytic) and Fluoridation Systems.
(1)
Status.
(2)
Chlorine and fluoride concentration (water analysis).
(3)
Chlorine and fluoride tank levels.
(4)
Water consumption.
n. Booster Stations.
(1)
Status.
(2)
Alternating of pumps.
(3)
Demand limiting of pumps.
(4)
Pressure.
(5)
Consumption.
o. Water Pumping Stations.
(1)
Status.
(2)
Demand limiting of pump motors.
(3)
Pressure.
(4)
Consumption.
9-3