DG 1110-1-1
12 Nov 99
TABLE B-4, Continued
CONSTRUCTION CHECKLIST
Checklist Item
Yes
No
Source of Data
PRECONSTRUCTION REVIEW, Cont.
Shift Schedule Set
Manpower Determined
Union Issues Resolved
All Construction Techniques
Specified
Utilities Cleared
CONSTRUCTION
Wells/Trenches :
Construction Techniques in
Compliance with Plans/Specs
Full Time Oversight by
Qualified Engineer or
Geologist
Trench Supports Used
Well Location Identified on
Wellhead
Well Depth Referenced to
Permanent Benchmark
Materials in Compliance
with Specifications
Wells Located as Shown on
Drawings
Trenches Located as Shown
on Drawings
Well Casings Installed as
Specified
Casings Designed to Support
B-13