DG 1110-1-1
12 Nov 99
TABLE B-3, Continued
DESIGN CHECKLIST
Checklist Item
Yes
No
Source of Data
PIPING DESIGN
Piping System Layout
Flow Rate
Indicators/Recorders
Materials of Construction
Requirements
Manifold Locations
Buried/Surface/Overhead
Locations
Valve Requirements
Flow Lines
Head Loss Considered
Cleanout Locations
Considered
TREATMENT SYSTEMS
Technology Options
Filtration Requirements
Feasibility Study Results
Concentration Fluctuations
Rental vs. Purchase
Utility Requirements
Local Utility Availability
Space Required/Available
B-9