DG 1110-1-1
12 Nov 99
TABLE B-4, Continued
CONSTRUCTION CHECKLIST
Checklist Item
Yes
No
Source of Data
Electrical Subsystems:
Instruments Calibrated
Water Treatment System
Installed/Functional
Outfall/Disposal Systems
Functional
POST CONSTRUCTION
As-Built Drawings Updated
As-Builts Approved/Issued
Temporary Structures
Removed
Operating Manual Ready as
Reference
Decontamination Area
Cleaned
SUBSURFACE
No Piping Leaks
Drawdown Within Specified
Tolerance
Monitoring Points
Expected Ranges
Temperatures and Pressures
Within Expected Ranges
PUMPS
Pump Test and Specific
Gravity Measurement
Flow Rates
B-18