TABLE B-4, Continued
CONSTRUCTION CHECKLIST
Checklist Item
Yes
No
Source of Data
CONSTRUCTION
Wells/Trenches, Continued :
Well Screens Installed as
Shown on Drawings
Well Centralizers Installed
Properly
Bollards or Other
Protection Installed as
Specified
Surface Completion Method
According to Specifications
Trench Width/Slope
According to Specifications
Pumps:
Pumps Installed at
Specified Depth
Foundations Complete Where
Needed
Level Control Devices
Installed
Injection Pumps Operational
Storage Tanks in Place/Not
Leaking
Dual-Phase Pumping in Place
Full Time Oversight
Submittals Required
Piping Installation:
Piping Sloped According to
Specification
B-15