STATEMENT OF WORK
SECTION 01010
STATEMENT OF WORK
1.1
PROJECT DESCRIPTION
The project consists of the design and construction of (Project
Description). The project is further defined in the RFP drawings,
specifications, and conceptual design analysis.
1.2
LOCATION
The project site location is at (Project Location).
1.3
PROJECT SCHEDULE
specified in Section 00800. The project phasings and requirement to
maintain aeronautical traffic for the different phases are detailed in
Section 01016 Detailed Technical Requirements.