UFC 3-260-02
30 June 2001
b. Control Stationing.
c. Geometric Layout.
C-9. BORING LOCATION PLAN AND BORING LOG DATA.
C-10. PAVEMENT REMOVAL PLAN.
a. Pavement Removal Limits (Dimensions, Stationing, etc.).
b. Type and Thickness of Pavement Removed.
c. Utilities and Structures Affected by the Removal.
(1) Manholes.
(2) Barrier Arresting Cables.
(3) Blast Deflectors.
(4) Runway/Taxiway Lighting.
(5) Communication Cables.
(6) Water/Sewer Lines.
(7) In Ground Aircraft Support Systems.
d. Special Notes Regarding Removals.
e. Location of Removal Sections.
C-11. REMOVAL SECTIONS AND DETAILS. Sections should be specific, not general or typical.
Show several sections. Show new sections for changes in pavement type, thickness, or any other
condition that has an impact on pavement construction. Sections should be complete both laterally
and vertically for the entire pavement structure including subgrade preparation.
a. Removal Limits (Lateral Dimensions, Depth).
b. Show Make-Up of the Existing Pavement.
(1) Pavement Type and Thickness.
(2) Joint Type (Doweled, Tied, Contraction, etc.).
(3) Existing Reinforcing (if any).
c. Special Notes.
(1) Equipment Type/Size.
C-3