g. Contractor's Staging and/or Storage Area.
h. Utility Hookup Locations.
I. General or Special Notes.
j. Concurrent Construction (Not in Contract).
a. Location and Sequencing of Work Areas.
b. Scheduling for each Phase of Project.
c. General Listing of Tasks to be Performed under each Phase.
d. Concurrent Construction that may Affect each Phase.
e. Location and Type of Area Control (Security) Measures.
(1) Temporary Barricades and Fencing.
(2) Obstruction Lighting.
(3) Temporary Pavement Markings (Closure Markings).
f. Traffic Circulation (Aircraft and Vehicular).
g. Special Notes.
(1) Security Measures.
(2) Contractor's Housekeeping Measures.
(3) Controls on Contractor's Traffic.
C-7. HORIZONTAL AND VERTICAL CONTROLS.
a. Layout.
b. Bench Marks (USGS Datum) with only one Master Bench Mark.
c. Control Stationing.
C-8. GEOMETRIC LAYOUT PLAN (OPTIONAL).
a. Curve Data.