UFC 3-260-02
30 June 2001
e. Surface and Subsurface Drainage System.
(1) Pipe (size, type).
(2) Structure construction.
(3) Bedding material.
(4) Filter material.
(5) Manhole construction.
f. Pavement Marking Materials.
B-12. LIST OF REQUIRED WAIVERS.
a. Reference regulation document (title, page, para.).
b. State the regulation in violation.
c. State the reason the waiver is required.
B-13. COST ESTIMATES.
a. Capital costs.
b. Life-cycle costs.
B-7