TM5-803-14
Figure 5-1. Sketch Site Plan for a Battalion Complex.
(g) Ensure that sufficient turn-around room
(c) Note the location of any necessary
is provided for service and emergency vehicle
ramps.
routes.
(d) Identify means of using topography and
(h) Locate dumpster pads.
plant material to help direct pedestrian flow.
(4) Pedestrian Circulation. The plan should:
(5) Grading and Drainage. The plan should:
(a) Further refine pedestrian circulation to
(a) Establish an overall grading concept for
assure clear and convenient flow of pedestrian
the site, showing proposed contours and critical
movement.
elevations on roadways, in parking lots, on walk-
(b) Assure barrier-free accessibility between
ways and at building entrances.
buildings and from barrier-free parking spaces to
(b) Define and locate stormwater manage-
at least one building entrance.
ment areas on site.
6-3