Table 3-3 Design-Build After Award Interior Design Process
DESIGN AND CONSTRUCTION PROCESS
INTERIOR
DESIGN
PROCESS
(A/E Or Govt.)
Award Design & Construction
Pre-Design Conference/ Design
Charrette
Verify SID/FF&E Requirements
Verify SID/FF&E Submittal Format
SID/FF&E Preliminary Submittal
SID/FF&E Presentation To
Customer
SID/FF&E Final Submittal
SID/FF&E Presentation To
Customer
Contractor obtain authorization to
procure through govt. sources
Procurement Of Furniture
Furniture Delivery And Installation
Photography Of Complete Interior
Post Occupancy Evaluation
3-3
FURNITURE, FIXTURES & EQUIPMENT ACQUISITION STRATEGY.
As early as possible and before starting any project, FF&E procurement criteria must be
determined in conjunction with the facility design criteria and the project delivery
process. First determine if the FF&E package will be part of the project design. Then
establish how and when the FF&E will be procured, for example, using O&M or NAF
funds. Additionally, the procurement method, format and schedule must be coordinated
with the applicable contracting office for their specific requirements.