DG 1110-1-1
12 Nov 99
TABLE B-2
FEASIBILITY STUDY CHECKLIST
Checklist Item
Yes
No
Source of Data
DESIGN BASIS
Cleanup Goals
Containment Goals
Plume Size/Configuration
Construction Division
Involvement
Extent
Contaminant Mass/Volume
Pathways/Receptors
Analysis
Concentrations of
Locations (Actual long term
pump test wells)
Remediation Targets
Cleanup Duration
Constraints
PERFORMANCE CRITERIA
Extent of Hydraulic Capture
Water Balance
Pore Volume Exchange Rate
Dissolved Mass Recovery
Rates and Mass Balance
LNAPL Recovery Rates
Concentration Trends
B-5