Attachment 18
A18.2.14. Siting should be coordinated as much as possible with the Base Comprehensive Plan.
Particular attention should be given to future construction (including additions or extensions) of
buildings, runways, taxiways, and aprons to preclude obstructing controller visibility at a future date.
A18.2.15. The ATCT should be sited so it is free of interference from or interference with existing
communications-electronics meteorology or non- communications-electronics meteorology facilities.
If an acceptable location is not otherwise obtainable, consider relocating these facilities.
Figure A18.1. Runway Profile and New Control Tower.
D1
D2
Ee
LIN
E OF
T
IGH
SIGH
S
T
F
EO
CONTROL TOWER
LIN
E as
Eb
E as
RUNWAY PROFILE
SEE FIGURE A18.3
SEE FIGURE A18.2
A18-3