Table 27
Required Components of a Closure Plan Report
o Location and type of drainage facilities installed.
o An estimate of anticipated settlement.
o Final cover soil thickness and physical characteristics (e.g.,
permeability).
o Groundwater protection features and monitoring provisions.
o Landfill gas protection features and monitoring provisions.
o Proposed future use for completed site:
- Type of vegetation.
- Irrigation requirements.
- Type of development planned, if any.
o A post-closure monitoring and maintenance plan and schedule, includin
contingency plans if monitoring indicates any deficiencies.
5.10-108