TM 5-814-3/AFM 88-11, Volume III
c. Depth to pervious rock. A minimum of 24 inches of unsaturated natural Soil is required beneath the
mound. This natural soil provides additional purification capacity and serves as a buffer in protecting the
as a part of the unsaturated soil needed for purification.
6-13