*TM 5-813-1/AFM-88-10, Vol. 1
f.
Feasibility of developing supply without
6-5. Checklist for surface water investigations
reservoir construction.
The investigations will cover the following items, as well
g.
Reservoir location if reservoir is required.
as others, as circumstances warrant.
h.
Plans for other reservoirs on watershed.
a.
Topographic maps showing pertinent
i.
Pertinent geological data that may affect
dam foundation or ability of reservoir to hold water.
b.
Hydrologic data, as required for project
j.
Locations for pumping stations, supply lines,
evaluations;
e.g.,
rainfall,
runoff,
treatment plant.
assessment of ground water resources and their
k.
Energy requirements for proposed system.
potential as the sole source or supplementary source of
l.
State water laws, rules and regulations,
supply.
procedure for obtaining right to use water, impact of
c.
proposed use on rights of other users.
d.
Intake location.
m.
Disposition of water supply sludge from
e.
Water quality data at or near proposed
treatment plant.
intake site.
6-2