*TM 5-813-1/AFM-88-10, Vol. 1
bacteriological analyses of water from existing wells.
5-10. Check list for design
e.
Assessment
of
probable
treatment
a.
Topographic maps of area where wells could
requirements, such as iron-manganese removal,
be located.
softening, corrosion control, sulfide removal.
b.
Reports on area geology and ground water
f.
resources from U.S.
Geological Survey, State
including identification of possible sources of pollution.
Geological Survey, and other state and local agencies
g.
Probable location, number, type, depth,
that have an interest in or have conducted ground water
diameter and spacing of proposed water supply wells.
investigations.
Significant problems associated with well operation.
contractors familiar with the area. Reports of test drilling
h.
Energy requirement of proposed system.
and pumping.
i.
Summary of applicable State water laws,
c.
Copies of logs of existing water supply wells,
rules, regulations, and procedures necessary to establish
drawdown data, pumpage, water table elevations.
water use rights. Impact of proposed use on established
Estimates of safe yield of aquifers.
rights of others.
d.
Records of physical, chemical and
5-22