CHAPTER 7
PROJECT PHASING MAP
data for the evaluation and selection of priorities for
7-1.
Objectives
projects to be included on the Project Phasing Map.
The Project Phasing Map a separate document pre-
Where a project can logically be programmed in two or
pared as part of the Installation Master Plan. It is prepared
more stages, project phasing should be considered in order
and submitted annually in accordance with the require
to make the most effective use of available resources.
mentsofAR21
The Project Phasing Map shows the
7-3. Evaluation and selection of
short-range facility requirements (immediate five years)
projects
necessary to implement the Master Plain The basis
objective of the Project Phasing Map is to outline a
projects should be evaluated to determine
a The listed
flexible short-term program of projects which are linked to
their priority for construction within the next five years.
and based on the long-term recommendations of the
The selected projects should be grouped in related sets
Master Plan
To support this short-term
which
out specific development objectives of the
other objectives
the
Phasing Map are to
and effectively support the mission of the
Master
determine which of the wide
of potential long-range
priority of projects
installation The relative ranking
improvements have the highest priority for
should be based on the extent to which the project carries
the level of allocated
or other available
out a specific objective identified in the Master Plan
resources to implement plan recommendations;
would resolve a current problem or
is
and provide a means by which annual development
necessary to carry out other
will contribute to
programs can be evaluated for conformance with
long-term development of the installation in accordance
and short-term objectives.
with the objectives of the Master
will contribute to
completion of facilities or programs already underway;
7-2. Identification of projects
would be
within authorized levels or can
The first step in preparation of the Project Phasing
for other finding sources; will improve the quality of the
Map is to identify those facility construction projects
natural or man-made environment can be integrated with
required for future development of the installation in
existing facilities to extend or improve their fictional
accordance with the Master
Projects based upon
and has the capacity to support multiple
should
TERF report and the Future Development
facilities at the installation
The list should include
be
b. The rationale for determination of priorities and
Required buildings and facilities not now provided
selection of projects should be responsive to the particular
at the installation.
needs and conditions which are expected to
the
Improvements to existing buildings and facilities
installation for the following five-year period The general
necessary to meet functional requirements.
order of priorities which serve as the basis for determination
Replacement of
existing buildings and
of specific projects is as follows
facilities.
Projects which resolve a critical functional deficiency.
Extension or replacement of existing utility service
Projects which resolve a current but non-critical
lines or facilities.
deficiency.
or extension of existing
for
Projects which are a necessary
development
other projects to
roadways.
- New roadway construction
which support
development
-
Major maintenance and repair projects.
- Other
b. The scope of the projects will become the basic
7"1