UFC 1-900-01
1 DECEMBER 2002
Tasks (hours)
Compone
Labor
Disassem Processi Supp
Component
nt Total
Hours
Unit
bly
ng
ort
Radiators
1.5
0.5
2.0
0.13
EA
Appliances
0.25
2.75
3.0
0.60
EA
Bathroom floor
2.5
0.50
3.0
0.038
SF
tile
Oak strip flooring
19.25
27.0
0.25
46.50
0.038
SF
Plaster 1st level
SF
34.25
10.0
5.50
49.75
0.012
(plaste
r area)
Plaster 2nd
SF
level
23.75
10.75
2.0
36.50
0.009
(plaste
r area)
Piping and wiring
6.75
3.25
0.50
10.50
0.0072
LBS
Partition walls
6.25
24.75
3.0
34.0
0.18
LF
Windows and trim
10.0
2.5
0.50
13.0
0.54
EA
Ceiling joists
1.0
4.75
0.5
6.25
0.0075
LF
Load-bearing
2.75
15.5
1.75
20.0
0.027
LF
walls
Sub-floor 2nd
16.0
6.0
1.25
23.25
0.023
SF
Joists 2nd level
7.25
16.25
1.5
25.0
0.027
LF
Sub-floor 1st
7.75
8.0
15.75
0.016
SF
Joists 1st level
7.0
10.0
17.0
0.020
LF
Stairs
2.5
0.75
0.75
4.0
0.3
Riser
Exterior
Gutters, fascias
2.25
1.0
3.25
0.014
LF
Chimney
33.25
40.5
4.75
78.5
0.16
CU FT
Gable Ends
8.0
3.0
0.75
11.75
0.053
SF
Masonry walls
SF
upper
14.75
104.5
20.5
139.75
0.25
(brick
area)
Masonry walls
SF
lower
15.75
84.0
5.25
105.0
0.078
(brick
area)
Roof
Roofing material
17.75
18.25
1.75
37.75
2.68
SF
Sheathing boards
21.25
14.5
1.5
37.25
0.028
100 SF
7.25
9.75
7.0
24.0
0.021
LF
1.25
2.25
3.5
0.036
LF
3-7