for adequate environmental controls for the elimination of health hazards. Also use this
review process for medical facility designs in excess of
||content||
million.
8-1.4.4
Space and Naval Warfare Systems Command (SPAWAR) Reviews.
There are two types of drawings for SPAWAR projects: Type (1) are drawings of the
building, site and other facilities, and Type (2) are drawings for electronic and other
equipment to be installed within, on, or adjacent to the building. Although Type (2)
drawings are sometimes prepared by SPAWAR, both types should bear standard
NAVFAC title blocks and drawing numbers in accordance with Chapter 7. On drawings
that require SPAWAR approval, SPAWAR signature can be applied in the NAVFAC
Signature Block in the supplemental location and the SPAWAR drawing cross reference
number can be provided on the border sheet (see 7-3.5.2, 7-3.7, and 7-4). SPAWAR
may also need to review where project impacts an adjacent facility, such as electro-
receivers.
8-1.4.5
Civil Works Contracts Reviews.
NAVFACENGCOM or the delegated Facility Engineering Command approves drawings
and specifications prepared for civil works subcontracts. Assign NAVFAC drawing
numbers to civil works contract drawings, and approve and sign the drawings as
"Satisfactory to" the prime contractor of the particular Navy industrial plant for whose
use the facility is provided.
8-1.4.6
Review by Other Government Organizations.
Approval of drawings for projects of other Government organizations or approval of
modifications or revisions of drawings prepared by such organizations is required as
follows:
Indicate approval by other Government departments or agencies by
appropriate signature in the supplemental locations provided on the
NAVFAC Signature Block (see 7-3.5.2, 7-3.7, and 7-4).
When NAVFAC drawings are prepared for construction projects for other
Government departments or agencies, submit fully developed concept
designs to the appropriate departments or agencies for formal approval.
For drawings prepared under the direction of NAVFAC, the other
Government organization provides approval solely for functional and
operational sufficiency.
When definitive, standard, or project drawings of other Government
departments or agencies are used by NAVFAC for design of projects for
those departments or agencies, make modifications or revisions to such
41