UFC 3-280-04
17 DEC 2003
Any of these sizes and loadings would require a spare filter, storage or
bypassing to maintain the flow through rate while a unit is off-line.
Table C-8. Preliminary Flow Diagram [SI]
Rate
Duration
Flow
SS
Flow
[L/s]
[hr/day]
[L/day]
[mg/L]
[kg/day]
Influent
12.0
24
1,036,800
NA
NA
Effluent
12.0
24
1,036,800
10
10.37
Filter Bypass
0
0
Filter Influent
6.196.63
24
100
Filter Effluent
6.196.63
24
10
Backwash Influent
0.190.63
24
Backwash Effluent
0.190.63
24
Backwash Recycle
0.190.63
24
Solids Treatment
0.190.63
0.5
Table C-8 Preliminary Flow Diagram [English]
Rate
Duration
Flow
SS
Flow
[gpm]
[hr/day]
[gpd]
[ppm]
[lb/day]
Influent
190
24
273,894
Effluent
190
24
273,894
10
22.8
Filter bypass
Filter influent
100
228
Filter effluent
Backwash influent
Backwash effluent
Backwash recycle
Solids treatment
C-14