TM 5-826-6/AFR 93-5
Figure A-95. High severity small patch.
(3) Counting procedure. If one or more small patches having the same severity level are located in a slab, it is
counted as one slab containing that distress. If more than one severity level occurs, it is counted as one slab with the
higher severity level being recorded.
w. Large patching (over 5 square feet) and utility cut, distress 67.
(1) Description. Patching is the same as defined in the previous section. Complete slab replacement is
counted as a large patch. A utility cut is a patch that has replaced the original pavement because of placement of
underground utilities. The severity levels of a utility cut are the same as those for regular patching.
(2) Severity levels.
(a) Low severity level (L). Patch is functioning well with very little or no deterioration (figs. A-96 through
A-98).
Figure A-96. Low seventy patch, case 1.
A-55