UFC 3-260-11FA
25 May 2005
APPENDIX B
DESIGN-BUILD AIRFIELD PROJECT
OUTLINE FOR GOVERNMENT-FURNISHED CONCEPTUAL DESIGN ANALYSIS
1.
INTRODUCTION
a.
Purpose of the Report. To describe the Government-furnished project
designs in sufficient detail for review, evaluation, and documentation of the
design, and to provide technical information for use by the Contractor to
complete Contractor-furnished design.
b.
Scope of the Report
1)
State the design phase that the report covers.
2)
List the topics discussed in report.
c.
Project Description
1)
Extent of the proposed construction (e.g., new construction; runway
extension; apron expansion; overlay; rehabilitation and repair;
lighting; drainage, security, and NAVAID improvements)
2)
Purpose of the proposed construction or improvements
3)
Types and extent of the construction activities (e.g., demolition,
excavation and embankment, grading, paving, patching, marking,
lighting, electrical, fencing, seeding)
d.
Project Authorization (Include copies of authorization letter, directive, or
other pertinent items, with dates.)
e.
Design Criteria. Reference the key criteria and directives used in the
design, with dates. Since criteria are constantly being revised and
updated, the key criteria should be documented so that the basis of the
design can become a historical record.
1)
Correspondence and directives
2)
Unified Facility Criteria (UFC)
3)
Engineering Technical Letters (ETLs)
4)
Technical manuals (TMs and AFMs)
5)
Engineering Circulars (ECs)
6)
Pavement evaluations/condition surveys
7)
Computer programs
8)
Other special design criteria