UFC 3-260-11FA
25 May 2005
3-2.8.3
Navy/Marines
NAVAIR 51-50AAA-2, General Requirements for Shore Based Airfield Marking and
Lighting
3-2.8.4
FAA
AC 150/5340-1H, Standards for Airport Markings (See Note 2.)
3-2.9
Theater of Operations
3-2.9.1
UFC
UFC 3-250-09FA, Design: Aggregate Surfaced Roads and Airfields
3-2.9.2
Air Force
ETL 04-7, C-130 and C-17 Landing Zone (LZ) Dimensional, Marking and Lighting
Criteria
ETL 97-9, Criteria and Guidance for C-17 Contingency and Training Operations on
Semi-Prepared Airfields
3-2.9.3
Army/Air Force
FM 5-430-00-2/AFJPAM 32-8013 Volume II, Planning and Design of Roads, Airfields,
and Heliports in the Theater of Operations Airfield and Heliport Design
3-2.10
Electronic NAVAIDS
See UFC 3-260-01, Airfield and Heliport Planning and Design, Attachment 17, for
references for electronic NAVAIDS.
3-2.11
Construction and Materials
References for construction and materials are listed in the various UFGS, Divisions 2
through 16.
NOTE 1.
References for hangar floors are for interior shop, storage, and
maintenance floors not subject to aircraft wheel loads. For hangar floors
subjected to aircraft wheel loads, UFC 3-260-02 applies.
NOTE 2.
Usually Department of Defense (DOD) criteria will apply to projects.
Exceptions include projects on joint use airfields and when DOD criteria is
nonexistent for the subject matter.
NOTE 3.
If this document has guidelines or requirements that differ from the UFGS
or Unified Facilities Criteria, the UFGS and the UFC shall prevail.
14