Home
Download PDF
Order CD-ROM
Order in Print
Home
>
United Facilities Criteria CD 1
>
> Subgrade preparation - Cont'd
Subgrade preparation
Figure 20-1. Frost area index of reaction (FAIR) for design of rigid pavements
Pavement Design for Airfields - index
Page Navigation
395
396
397
398
399
400
401
402
403
404
405
UFC
3-260-02
30
June
2001
The
Final
Depth
of
Subgrade
Preparation
D
will
be:
Traffic
Area
D, mm
(in.)
A
330
(13.0)
B
330
(13.0)
C
179
(7.0)
D
381
(15.0)
20-26