Table 16 (Continued)
Solid Waste Landfill Design Checklist
Step
Task
(1) Excavation plans (including benches)
(2) Sequential fill plans
(3) Completed fill plans
(4) Fire, litter, vector, odor, and noise controls
c. Compute solid waste storage volume, soil requirement volumes,
and site life
d. Develop final site plan showing:
(1) Normal fill areas
(2) Special working areas
(3) Leachate controls
(4) Gas controls
(5) Surface water controls
(6) Access roads
(7) Structures
(8) Utilities
(9) Fencing
(10) Lighting
(11) Washracks
(12) Monitoring wells
(13) Landscaping
(1) Excavated fill
(2) Completed fill
(3) Phased development of fill at interim points
f. Prepare construction details
(1) Leachate controls
(2) Gas controls
(3) Surface Water controls
(4) Access roads
(5) Structures
(6) Monitoring wells
g. Prepare ultimate land use plan
h. Prepare cost estimate
i. Prepare design report
j. Submit application and obtain required permits
k. Prepare operator's manual