5-1. Regulatory requirements.
a. Requirements are contained in AR 200-1 for Army projects and in AFR 19-1 for Air Force projects.
These regulations implement Executive Orders and DOD Directives and, in general, direct compliance with
treatment requirements established by the Federal Environmental Protection Agency and the environmental
agency of the state in which the installation is located. The National Pollutant Discharge Elimination System
(NPDES) permit requirements established by the U.S. EPA Regional Office and/or State Water Pollution
Control authorities should serve as the effluent standards for the facility.
b. Effluent requirements
for new Federal facilities that establish
maximum pollution discharge limitations
will be provided by coordination of the Corps of Engineers Design Office with the EPA Regional Federal
Facilities Coordinator. AFP 19-5 provides guidance in coordinating design for Air Force projects, and TM 5-
814-8 provides guidance in coordinating design for other military projects.
c. In countries or areas not under U.S. control or administration, projects or activities are subject to the
generally applicable environmental laws, regulations and stipulations of the foreign government concerned.
5-2. Process selection factors.
a. The design of treatment facilities will be determined by feasibility studies, considering all engineering,
economic, energy and environmental factors. For the purpose of comparison, the energy generated by the treat-
ment process and used in the treatment plant will not be included in the energy usage considered. Only the
energy purchased or procured will be included in the usage evaluation. All legitimate alternatives will be
identified and evaluated by life-cycle cost analyses.
b. According to section 313 (b) (2) of PL 95-217, construction shall not be initiated for facilities for
treatment of wastewater at an Federal property or facility if alternative methods of wastewater treatment at
some similar property or facility utilizing innovative treatment processes and techniques, including but not
limited to methods utilizing recycle and reuse techniques and land treatment, are in use. If the life-cycle cost
of the alternative treatment works exceeds the life-cycle cost of the most cost effective alternative by more than
15 percent, then the least expensive system must be used. The Administrator may waive the applications of
this paragraph in any case when the Administrator determines it to be in the public interest, or that compliance
with this paragraph would interfere with orderly compliance with conditions of a permit issued pursuant to
section 402 of this act.
c. Request
for waiver of
the above requirement, with supporting justification, will be
forwarded through
command channels to HQDA (CEEC-EB) WASH DC 20314-1000 for Army projects and HQ USAF/LEEE
WASH DC 20322 for Air Force projects.
5-3. Impact on receiving waters.
The toxicity, coliform count, biochemical oxygen demand, chemical oxygen demand, settleable solids, and
nutrient load of the waste stream must be considered in determining its impact on the receiving waters. The
impact is dependent on the ability of the receiving water to assimilate the waste stream. Dissolved oxygen
levels provide one of the means to interpret the impact. Increased waste loads cause increased microbial
activity, exerting a high oxygen demand and a lowering of the dissolved oxygen level of the receiving water.
A low dissolved oxygen level affects the viability of most aquatic life. Design data for oxygen levels in fresh
water are given in appendix B.
5-1