for the indicator piles should reflect the specifications of the design.
e. Establish Criteria for and Complete Load Tests. In addition to the tests on the indicator piles, load
testing on production piles should be planned for during design and contracted for separately from the
piling. Any use of dynamic testing in conjunction with static load testing should be specified and properly
correlated with any statically load tested piles, whether they be indicator piles or otherwise.
f. Establish Pile Lengths from Results of All Tests. Pile lengths should be finalized only after the
indicator pile testing is complete and the analysis has been performed on the results.