Preliminary Cross Sections (indicating building heights, structures, general construction).
Preliminary Exterior Elevations (includes material indications, windows, doors, signs, etc.).
Typical Wall Sections (includes general construction and insulation).
Preliminary Finish Schedule.
Preliminary Door Schedule.
Details of special construction.
Outline Specifications (includes all architectural elements).
Structural
Codes to be used for design, complete design loads, and material strengths.
Special structural requirements including specific load conditions and deviations from the national code.
Preliminary Foundation and Framing Plans (includes typical foundations, floor and roof framing).
Outline Specifications (describing all structural elements and systems including soil compaction
for foundations).
Plumbing
Preliminary Plumbing Plans (includes plumbing fixtures, diagram of mains for water supply, sanitary waste
and compressed air system).
Outline Specifications (describing all systems and major equipment).
HVAC
Preliminary HVAC Plans (includes single line diagrams indicating zoning, distribution, capacities of
equipment and central plant layout, if applicable).
Systems Selection Analysis and discussion (Life cycle cost plus discussion of why system was picked).
Outline Specifications (describing all systems and major equipment).
Fire Protection
Preliminary Fire Protection Plans (includes site, fire system, densities, and occupancy/hazardous
classification for each area).
A description of the control system such as activation of the system, interlocks with HVAC system and
connection to detection and alarm system.
Define the type of Automatic Fire Detection that will be provided.
Outline Specifications (describing all systems and major equipment).