CEMP-E
TI 800-03
1 July 1998
j. If possible, avoid using existing base maps or aerial photography for the site survey
information. Change orders are costly during construction and delay the project. A current site
survey should be obtained.
k. Consider a requirement to design for future expansion.
4-3