CEMP-E
AEI for Installation Support
Thursday, 17 October 1996
f. Floor Plans.
h. Door and Window Schedules.
i. Exterior and Interior Finish Schedules.
j. Building Elevations.
k. Building and Wall Sections.
l. Photographs (Indicate where photos were taken).
m. Standard Details.
n. Structural Drawings.
o. Mechanical Drawings.
p. Electrical Drawings.
q. Plumbing Drawings.
r. Miscellaneous Details.
9. DRAWING PRODUCTION (If Applicable).
a. General. Normally, title sheets, schedule of drawings, or revision sheets are not required
for projects with four or less sheets of drawings.
b. Title Sheets and Schedule of Drawings. Title sheets should provide signature and
approval blocks for the responsible government officials in the design agency and at the military
installation representing the customer and a schedule of drawings if appropriate.
c. Drawing Numbers. Consecutive sheet numbers in a circle (ring numbers) should be
provided in the lower right corner of each drawing sheet, except the title sheet and schedule of
drawings. Location codes, prefixes, and drawing numbers should be in accordance with local
design agency practices.
I-11