UFC 3-280-03
23 JULY 2003
CHAPTER 4
CHECKLIST FOR DESIGN DOCUMENTS
4-1
DESIGN ANALYSIS
4-1.1
Process Description
4-1.1.1
Sludge Characteristics
4-1.1.2
Conditioning Requirements
4-1.1.3
Performance Requirements
4-1.1.4
Description of Equipment and Controls
4-1.2
Calculations
4-1.2.1
Solids Management Calculations
4-1.2.2
Equipment Sizing
4-1.2.3
Conditioning Feed
4-1.3
Records
4-1.3.1
Correspondence
4-1.3.2
Manufacturers Literature
4-1.3.3
Environmental Criteria
4-2
PLANS
4-2.1
Process Flow Diagrams (Liquid and Solid)
4-2.2
Equipment Layout Plan
4-2.3
Piping and Plumbing Plans, Sections, and Details
4-2.4
4-2.5
Connection Details
4-2.6
Coordination with other Disciplines
4-2.6.1
General Plans (Drawing Index, Legend and General Notes,
Abbreviations)
4-2.6.2
Structural Plans (Concrete Slab and Foundation Plans)
4-2.6.3
Architectural Plans (Interior and Exterior Elevations)
4-2.6.4
Mechanical Plans (Hydraulic Profiles of Liquids and Solids, HVAC Plans
and Details)
4-2.6.5
Electric Plans (Line Diagrams, Power and Control Plans)
4-1