UFC 3-260-11FA
25 May 2005
APPENDIX D
UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS)
DESIGN-BUILD RFP REVISIONS
Each specification section should be edited in accordance with its respective Designer's Notes.
Fill in the blanks or choose among alternatives, as indicated. The additional requirements listed
below amplify or expand on those Notes for selected sections used in airfield pavement design-
build projects. Only the language identified in the Guide Specifications or listed below should be
edited.
Para. Ref.
Requirement
Edit
1.3
Unit Prices
For lump sum payment, delete subparagraphs.
1.4
System Description
Coordinate with user for selection of drainage layer material and
use "Tailoring Option" of SpecsIntact editor to select the material.
2.2.2
Gradation
Select gradation in Table 1, use "Tailoring Option."
Requirements
2.3
Bituminous Materials
Specify penetration grade asphalt cements for OCONUS
projects.
2.4
Cementitious Materials
Specify ASTM C 150, Types I and/or II Portland cement.
02721 Subbase Courses
1.2
Unit Prices
For lump sum payment, delete subparagraphs.
2.1.1
Subbase Materials
Do not permit the use of State DOT materials for airfield
pavements.
2.1.1
Subbase Materials
Select gradation to match CBR used in pavement design.
3.1
Aggregate Sources
There are no aggregate resources on Government property.
3.7
Compaction
Specify 100 percent for flexible pavements.
3.8
Proof Rolling
Select proof rolling only for the specified conditions; otherwise,
delete.
02722 Aggregate And/Or Graded-Crushed Aggregate Base Course
1.2
Definitions
Select ABC or GCA through specification to match CBR used in
pavement design. See UFC 3-260-02, Chapter 8, for design CBR
for each material.
1.3
Unit Prices
For lump sum payment, delete subparagraphs.
2.1
Subbase Materials
Do not permit the use of State DOT materials for airfield
pavements.
2.1.1.c
Coarse Aggregate
Delete recycled concrete as a coarse aggregate unless the
subgrade is free of sulfates and the concrete is not-Alkali-Silica
Reactive.
3.2
Aggregate Sources
There are no aggregate resources on Government property.
3.5.5
Compaction
Specify 100 percent for flexible pavements.
3.5.6
Thickness
Show compacted thickness on drawings.
3.5.7
Proof Rolling
Select proof rolling only for the specified conditions; otherwise,
delete.
02748 Bituminous Tack and Prime Coats
1.2
Payment
For lump sum payment, delete subparagraphs.
3.6
Field Quality Control
Sample and test all OCONUS-supplied materials per lot
delivered.
02749 Hot-Mix Asphalt (HMA) for Airfields
1
General
Select "Other Than FAA" from the SpecsIntact Tailoring Option
menu.
1.5
Payment
Include unit price from government estimate for lump sum
projects.
67