Attachment 15
A15.6.3.7. Installation and maintenance of temporary lighting and marking for closed or
diverted aircraft routes on airport operations areas.
A15.6.3.8. Revised vehicular control procedures or additional equipment and manpower.
A15.6.3.9. Marking/lighting of construction equipment.
A15.6.3.10. Storage of construction equipment and materials when not in use.
A15.6.3.11.
Designation of responsible representatives of all involved parties and their
availability.
A15.6.3.12. Location of construction personnel parking and transportation to and from the work
site.
A15.6.3.13. Marking/lighting of construction areas.
A15.6.3.14. Location of construction offices.
A15.6.3.15. Location of contractor's plants.
A15.6.3.16. Designation of waste areas and disposal.
A15.6.3.17. Debris cleanup responsibilities and schedule.
A15.6.3.18. Identification of construction personnel and equipment.
A15.6.3.19. Location of haul roads.
A15.6.3.20. Security control on temporary gates and relocated fencing.
A15.6.3.22. Blasting regulation and control.
A15.6.3.23. Dust control.
A15.6.3.24. Location of utilities.
A15.6.3.25. Provision for temporary utilities and/or immediate repairs in the event of disruption.
A15.6.3.26. Location of power and control lines for electronic/visual navigational aids.
A15.6.3.27. Additional security measures required if AFI 31-101, Installation Security Program,
is impacted (relocation or reconstruction of fences or security sensors).
A15.6.3.28. Marking and lighting of closed airfield pavement areas.
A15.6.3.29. Coordination of construction activities during the winter with the snow removal
plan.
A15.6.3.31. Shutdown, relocation and/or protection of airport electronic and or visual
navigational aids.
A15.6.3.32. Smoke, steam, and vapor controls.
A15.6.3.33. Notification to crash/fire/rescue and maintenance personnel when working on water
lines.
A15.6.3.34. Provide traffic directors/wing walkers, etc., as needed to assure clearance in
construction areas.
A15-3