Table 19
Topics Typically Described in a Conceptual Design Report
o Site Conditions
- Existing site
- Topography and slopes
- Surface water
- Utilities
- Roads
- Structures
- Land use
- Subsurface exploration date
- Bedrock
- Climatology conditions
o Design Criteria
- Solid waste types and volumes expected
- Fill area dimensions
- Site life
o Operational Procedures to Be Used to Implement Design
- Site preparation
- Solid waste unloading
- Handling
- Covering procedures
o Environmental Safeguards
- Control of leachate
- Surface water
- Gas
- Blowing paper
- Odor
- Vectors
o Initial Site Preparation and Development Steps
o Site Closure and Postclosure Monitoring and Maintenance Plan
o Project Cost Estimates (Generally Prepared for In-House Use Only)