TM 5-818-5/AFM 88-5, Chap 6/NAVFAC P-418
(Modified from "Foundation Engineering," G. A. Leonards, ed., 1962, McGraw-Hill
Book Company. Used with permission of McGraw-Hill Book Company.)
Figure D-1. Open excavation; two-stage wellpoint system; gravity flow.
D-2